Breakwater upgrade boost for Onslow

The 730m breakwater, built more than 50 years ago, has been refurbished above and below the waterline, with about 25,000 tonnes of rock added to the structure

from The West Australian https://ift.tt/2MeCFtk

No comments

Powered by Blogger.